Peak Downs Mine (PDM), operated by BHP Mitsubishi Alliance (BMA), is a coal mine located in Central Queensland, approximately 40 kilometers southeast of Moranbah, or about a 35-minute drive. The project site is situated within the operational Coal Handling and Preparation Plant (CHPP), specifically on the western side of the CHPP, above the Coal (Froth) Thickener. Due to the extensive wear on the existing Coal Thickener Bridge, which has reached the end of its operational life, replacement is now necessary. This critical structure supports a wide range of essential services, including mechanical drives, hydraulic systems, electrical and control systems, the flocculant dosing system, coal slurry and water pipelines, and compressed air infrastructure.

Additionally, the existing bridge provides suspension for the feedwell and thickener raking system, making it an integral part of the CHPP’s overall functionality. As part of this project, the goal is to replace the Coal Thickener Bridge structure and associated infrastructure. To achieve this, all existing equipment will be reinstalled, and any necessary new piping, valves, supports, and cabling will be included as part of the upgrade. In order to minimise downtime, this critical work will be scheduled during the planned FY24 shutdown to ensure the Coal Thickener is restored to full operational status.

This project is crucial for maintaining the reliability and efficiency of the CHPP at Peak Downs Mine, supporting its continuous production. CE Group, as an experienced electrical mining contractor, has been engaged to carry out the electrical and instrumentation (E&I) scope of work. Throughout the project, CE Group will ensure that all electrical systems are replaced, tested, and commissioned in line with industry standards and safety regulations. Moreover, their involvement will support the seamless integration of the newly installed infrastructure, ensuring minimal disruption to the CHPP’s operations.

In addition, CE Group will provide ongoing support during the commissioning phase to guarantee that all systems are functioning optimally. Ultimately, the successful replacement of the Coal Thickener Bridge will enhance the operational efficiency of Peak Downs Mine, ensuring that the CHPP continues to meet production targets while maintaining high standards of safety and performance.

Summary

Location

Queensland

Client

Project Completion

2024

Value

375K

Related Projects