BAC – DTB Air Circuit Breaker Installation
Brisbane, Queensland

Project Details

The Brisbane Airport plays a crucial role in the safe transportation of over 20 million passengers each year. As part of its ongoing commitment to safety and operational excellence, it became necessary to remove and reinstate several Air Circuit Breakers in the domestic terminal. Consequently, this upgrade was essential to maintaining the efficiency and reliability of the airport’s electrical systems.

Given the importance of the project, CE Group, a trusted electrical industrial contractor, was selected to manage these critical changeovers in the main switchboard. Therefore, a comprehensive analysis of the work requirements was carried out to ensure every detail was addressed. CE Group worked closely with Brisbane Airport Corporation (BAC) to identify, mitigate, and control any potential risks associated with the project. Additionally, the safety of all passengers and minimizing disruption were key objectives throughout the task.

To ensure a smooth delivery, CE Group implemented a highly coordinated approach, carefully planning each step to avoid operational downtime. Furthermore, the project was carried out during specific time windows to prevent interference with the airport’s daily activities. By collaborating effectively with BAC, CE Group successfully maintained the highest safety standards, which was crucial for the project’s successful completion.

Ultimately, both CE Group and BAC considered the project a significant success. The seamless execution of the switchboard changeovers, without any passenger disruption, highlighted CE Group’s expertise as a reliable electrical industrial contractor. As a result, the safe and timely completion of the works further underscored CE Group’s unwavering commitment to quality, safety, and client satisfaction.

Summary

Location

Brisbane, QLD

Client

BAC

Project Completion

2016

Value

1m