GRM Coal Reclaimer and Stacker Upgrade

Goonyella Riverside Mine (GRM) is a coal mine located in the Bowen Basin approximately 30km north of Moranbah, and 190km southwest of Mackay. The Raw Coal Reclaimer and Raw Coal Stacker at Goonyella Riverside Mine is over 30 years old and much of both machines do not meet latest Standards, Codes and BMA specifications. In effort to rectify this and extend the machines’ operational life, the machines were to undergo an overhaul of electrical and mechanical infrastructure.

The project required significant works during the shutdown. The scope of work encompassed all E&I activities and Mechanical rectification on both machines, which included the following:

  • Replace existing switchrooms including temporary works to allow removal
  • Replace travel motors, remove existing travel brakes and replace isolators and cabling
  • Re-connect existing cables to new switchrooms
  • Provide modification to platforms and handrails to accommodate new switchrooms
  • Testing and quality assurance
  • Provide assistance for commissioning

POM Power Station, Port Moresby

CE Group has been engaged to provide labor services for the development of the POM Power Station near Port Moresby. This project is part of the Clough Wartsila Joint Venture and involves several key elements. As a leading electrical contractor in PNG, CE Group’s role is critical to ensuring the station’s success.