Teys Beenleigh WWTP

CE Group and Teys Australia continued with the Beenleigh Waste Water and Bio-Gas Collection project. As a trusted electrical industrial contractor, CE Group was tasked with upgrading the wastewater treatment system at the Teys Beenleigh facility.

JBS Dinmore Lighting

CE Group’s Scope at JBS Dinmore was to replace all the lights in the ceiling, above the Boning Room Floor. The JBS Dinmore Processing Plant is the largest beef plant in the Southern Hemisphere, with a daily production of 3,400 heads per day and an onsite staff base of more than 2,000 team members.

All work for this project was completed during weekend shutdowns, due to the tight timeframes for completion and difficult working conditions during business hours.

Kerry Ingredients Light and Power

E Group’s unique and extensive experience as an electrical industrial contractor in the food and process industry ensured the successful completion of this Light & Power Project at Kerry Ingredients. The project involved the highest standards of workmanship, which CE Group consistently delivers on all projects.

Teys Trim Management Beenleigh

This project encompassed the supply and installation of all Electrical, Communications and Dry Fire services for the construction of a new Trim Line Facility and Carton Store at Teys Australia’s Beenleigh plant.

New Switchboards, Cable Reticulation and Cabling were required, along with food grade Lighting and Motor Connections in the sensitive meat processing area. CE Group also provided Control Systems design and installation for the Cryovac and new Vacuum Pumps.

BAC – DTB Air Circuit Breaker Installation

The Brisbane Airport is responsible for the safe transportation of over 20 million passengers per year. As part of their ongoing commitment to quality, it was deemed necessary to remove and reinstate several of the domestic terminal’s existing Air Circuit Breakers.

CE Group was contracted to perform a series of critical changeovers in the domestic terminal’s main switchboard. The importance of this project resulted in a comprehensively detailed analysis of the work requirements and associated risks surrounding the task.

Hail Creek Industrial Area Upgrade – HV Tyre Bay

The Hail Creek IAU – Heavy Vehicle Tyre Bay project was granted to CE Group based on the exceptional works previously completed on the same site.

This project included the supply and installation of high bay lighting to suit task requirements, office area lighting and the facility’s general power requirements. CE Group also designed, manufactured and installed the various switchboards for the Tyre Facility. Our scope of work included the civil works for the extensive power supply submain run to the Tyre Bay Facility.

Hayman Island – STP

The existing Hayman Island Sewerage treatment plant is located on the south-western side of the island off the coast of Central Queensland and required to be upgraded to meet the high standards of the resort and the growing tourist activity on the island. CE Group were contracted to design, implement and install a new electrically automated sewerage treatment control system.

CE Group’s engineering team were set some challenging design parameters which focused on the reduction of power consumption and environmental durability with no loss to the operation of the resort throughout the construction phase.

Maleny STP

CE Group, a leading electrical water infrastructure contractor, was contracted to manage the design and construction of the electrical and process control services for the new Maleny Sewerage Treatment Plant. This project was a significant addition to community infrastructure for Unity Water, with the development focusing on four key objectives. These objectives included delivering a safe, reliable, and robust solution, while providing value for money to the residents of Maleny.

Seqwater Chemical Dosing

The Chemical Dosing Systems Upgrade project focused on improving the chemical dosing systems at Seqwater’s West and East Bank Water Treatment Plants. As a leading electrical water infrastructure services contractor, CE Group played a key role in this significant upgrade.

Karumba Waste Water Plant

CE Group was engaged to provide the base building electrical, along with the process control and data acquisition systems. The base building works include mains installation, switchboards, generator systems and UPS supply, general light and power and lighting protection systems. CE Group designed and manufactured the switchboards within our Loganholme Head Office factory.

The Process Control System was a design and construct contract based on a functional description provided by the client. The plant automation and programming was undertaken by CE Group to industry best practice, including supply and programming of the site SCADA system.